34-Trade Multi-Currency Global Construction Estimator
Powered by BidForge regional labor/material indices (Turner & Townsend / Arcadis baselines), ECB FX rates, and epsilon-DP federated cost pooling.
| CSI Trade | Qty | Labor (Minor) | Material (Minor) | Line Total | |
|---|---|---|---|---|---|
| [03 30 00] Cast-in-Place Structural Concrete | 45 m³ | £5,113.09 GBP | £6,782.52 GBP | £11,895.61 GBP | |
| [05 12 23] Moment-Frame Connections & Steel Erection | 12 EA | £3,197.15 GBP | £2,843.18 GBP | £6,040.33 GBP | |
| [26 05 00] Electrical Power, Switchgear & Distribution | 8 kVA | £1,410.51 GBP | £1,887.84 GBP | £3,298.35 GBP |
ε=1.5 Laplace Pool (24 peers): £21,232.77 GBP
Estimated Total (Integer Minor Units)
£21,234.29 GBP
Raw Minor Units: 2123429 (GBP)
Material catalog baseline seeded from DDC CWICR by Artem Boiko / DataDrivenConstruction (CC BY 4.0, 27,060 items) + MasiDyn 34-trade verified benchmark spine. OpenConstructionEstimate-DDC-CWICR (CC BY 4.0).