On-Demand Global Construction Dispatch, Built Like Uber.
Pin any structure on Earth via Overture Maps + Uber H3 res-10 cells, match licensed multi-trade crews with SovereignCRM atomic claims, price 34 CSI trades in local currency, and settle in integer minor units.
Three Global Construction Verticals, One Unified Dispatch Rail
From single-technician 15-minute urgent structural & MEP interventions to 40-crew heavy-civil EPC infrastructure programs worldwide.
Residential & High-Density Housing
Rapid structural, electrical, HVAC, roofing, waterproofing, plumbing, glazing, and multi-unit residential turnkeys with 15-minute Tier-1 Job SLA.
Commercial, Industrial & Tenant Buildouts
Retail, logistics hubs, data centers, hospitals, elevators, fire protection, curtain-wall glazing, and multi-site portfolio rollouts.
Heavy-Civil, Infrastructure & EPC
Earthwork, structural steel, mass concrete, traffic control, utility corridors, scaffolding, and multi-coordinator sovereign infrastructure programs.
SovereignCRM 4-Tier Crew Hierarchy & Atomic Claim SLAs
work-order → tier → crew → atomic-claim → dispatch
Atomic leaf; 1 specialist, 1 atomic claim; urgent residential & rapid MEP/structural dispatch
1 lead + 1–4 atomic job-workers; multi-trade residential & commercial scopes
Scale 2 (~1 architectural overseer per 3 workers); commercial & industrial buildouts
Scale 3 (1 global architect per 4 regional coordinators); heavy-civil & EPC infrastructure
Planetary Uber H3 Res-10 & SovereignCRM Crew Dispatch
Every parent project decomposes into atomic job leaves: one worker per atomic claim, zero double-booking, cryptographically receipted.
34-Trade Multi-Currency Global Construction Estimator
Powered by BidForge regional labor/material indices (Turner & Townsend / Arcadis baselines), ECB FX rates, and epsilon-DP federated cost pooling.
| CSI Trade | Qty | Labor (Minor) | Material (Minor) | Line Total | |
|---|---|---|---|---|---|
| [03 30 00] Cast-in-Place Structural Concrete | 45 m³ | £5,113.09 GBP | £6,782.52 GBP | £11,895.61 GBP | |
| [05 12 23] Moment-Frame Connections & Steel Erection | 12 EA | £3,197.15 GBP | £2,843.18 GBP | £6,040.33 GBP | |
| [26 05 00] Electrical Power, Switchgear & Distribution | 8 kVA | £1,410.51 GBP | £1,887.84 GBP | £3,298.35 GBP |
Material catalog baseline seeded from DDC CWICR by Artem Boiko / DataDrivenConstruction (CC BY 4.0, 27,060 items) + MasiDyn 34-trade verified benchmark spine. OpenConstructionEstimate-DDC-CWICR (CC BY 4.0).
9 Deterministic CinderBid Back-Office Organs
All balances are computed in exact integer minor units across 9 automated back-office organs (schedule, crm, invoice, collect, job_cost, legal, compliance, books, hr).
Deterministic accounts-receivable aging ledger in exact integer minor units.
Escalation ladder off the AR ledger connected directly to /invoice and /paid.
Multi-crew calendar routing with SovereignCRM atomic claim non-collision.
Reconciles committed labor/material minor units against invoiced revenue.
Tracks worldwide residential, commercial, and heavy-civil work-order lifecycles.
Jurisdiction-aware construction agreements, milestone releases, and change orders.
Proactive certificate, bond, and safety-credential expiry gates before dispatch.
Reads invoice + job_cost + hr ledgers for deterministic quarterly tax reporting.
Tracks trade certifications, W-9 / W-8BEN status, and overtime-aware crew payouts.
Build Next-Gen Autonomous AI & BEAM Systems
Architect high-impact modules for Primus, ConstructMCP, and BidForge, or onboard licensed global construction crews. Earn vested equity upside with scheduled quarterly cash-out liquidity.